Last Autumn we decided to build a swimming pool in the back garden,this is the story of said job.
After shifting many skips full of soil the weather took a turn for the worse and it was decided to halt proceedings until the Spring. Well we are here and off and running. The Dough Boy kit has arrived, a 24 x 12 foot pool with extra deep end liner. There are two plans and a dvd to sift through before starting and some youTube clips as well.
The first step has been to excavate the pool to very accurate measurements all done by hand as this level of precision cannot be obtained by machine. With strict instructions not to fill low points the ground was shaved slowly until perfectly level.
The next job is to install the concrete block pads,side supports and the pressure pads.The side support posts are designed to lean in prior to the pool being filled,then the water pressure will force the sides upright.You can also see the deep swimming area dug out,which the stretch liner will follow.A big concern at present is the amount of sharp flint at the base of lower level at present and I am waiting on expert advice from manufacturer before proceding.
I found that site very usefull and this survey is very cirious, I ' ve never seen a blog that demand a survey for this actions, very curious... Inground pools in West Virginia
ReplyDelete